Quality Energy installed a 99kW solar PV system for McMillan Distributors, reducing their energy costs and improving efficiency while enhancing their environmental sustainability.
The IGA store in Bungendore hired Quality Energy to install a 152kW solar PV system after being impressed with our work at neighbouring Cellarbrations. In addition to the installation, Quality Energy provided project management assistance to maximise financial benefits and efficiency for the client.
David Moss Corporation's Geebung manufacturing plant has been facing a significant issue of harmonic pollution, which has resulted in high power bills for the business due to a low power factor. Quality Energy custom-built and installed 1700kVAr Power Factor Correction solution to improve power factor and increase cost and productivity efficiency.
Quality Energy installed a 25kW EV charger at Western Program Alliance's office in Footscray, Victoria for their pool vehicles, as part of WPA's sustainability strategy to electrify their fleet vehicles.
Service stations such as Budget Petrol in Goulburn are increasing their investment in EV chargers in preparation for a reduced global demand for fossil fuels. Quality Energy installed a rooftop-mounted solar power system to help the customer achieve energy autonomy by improving their power supply and reducing their tariff charges.
Quality Energy installed a 37kW solar panel system for award-winning pie and baked goods Country Cob Bakery, which was looking for a clean energy source to power its manufacturing operations.
Kellogg's Australia is a large energy user with expensive commercial electricity contracts. As cost of production increase and a commitment to be more energy efficient, Kellogg's Australia engaged Quality Energy to explore how to reduce their electricity demand charges while optimising their production's electrical environment.
Quality Energy has been helping Arctic Ice's Australian sites to maximise their energy efficiency via our custom Power Factor Correction solutions. We integrate a Solar Power system with Power Factor Correction at their Victorian site to help Arctic Ice reduce their carbon footprint, as well as any excess demand charges.
Quality Energy has been supporting Visy Industries to reduce their electrical demand (kVA) for over 20 years. They were experiencing higher electricity bill and equipment overheating in their production and contacted Quality Energy to design a solution.
Quality Energy was awarded the project to install four EV chargers at IKEA in Marsden Park, NSW, in support of the world-famous flat-pack furniture brand's strong commitment to being climate-positive, reducing more greenhouse gas emissions than what the entire business emits.
Quality Energy was contacted by Sydney's Sutherland Shire Council to install two EV chargers at the Council car park in Sutherland, NSW as part of their commitment to achieving carbon neutrality by 2030 with respect to the Council's own operations.
Quality Energy analysed Mercedes-Benz Australia's power profile at their national parts warehouse and overlaid that with their energy spend to help design the most cost-effective and high-performance solar power solution for their operations.
Quality Energy was engaged to design and manufacture a Power Factor Correction system for Covino Farms to improve their Power Factor and reduce their electricity bill. The proposed solution would need to fit in a tight space and withstand heat stress.
Quality Energy supported Laminex’s landlord to deliver energy efficiency upgrades for their tenant to reduce running cost and retain their tenant.
Quality Energy resolved the harmonic pollution issue for Jalna which is causing unplanned production shutdowns.
Quality Energy reduced the harmonic pollution that was interfering with sensitive medical imaging equipment, so Flinders Private Hospital can continue their critical lifesaving work.
Quality Energy improved Newscorp’s Power Factor as a response to their electricity provider’s change in demand tariffs which increased their energy cost.
Quality Energy detected and resolved harmonic interference that was disrupting the hospital's ECG test result.
Quality Energy helped Emerging IT take control of their electricity spend and uncertain wholesale electricity prices through solar PV installations.
Quality Energy was given the task of improving the power factor of a land rig, which required more drilling power than the generators installed could provide.
Quality Energy helped Rialto Towers improve their Power Quality to meet the Energy Authority regulations and reduce unplanned lift outages.
Quality Energy analysed the energy use profile and detected excess energy demand which is placing unnecessary demand charges.
A power quality audit will identify issues and give us the data we need to design an appropriate solution for your business.
Looking to get expert advice? Fill in your details below and we'll get right back to you.
We respect your privacy
Oops, there was an error sending your message.
Please try again
Have a question or comment? Let us know.
Head office – Melbourne
Other Locations
New South Wales
Queensland
South Australia
Tasmania