NSW Commercial Battery Rebate 2026: BESS4 and BESS5 Explained

September 17, 2026

NSW businesses can now reduce the capital cost of commercial battery storage through the Peak Demand Reduction Scheme.


The NSW Batteries for Businesses Incentive commenced on 1 September 2026 and covers eligible batteries with more than 20 kWh and up to 30 MWh of usable capacity.


Two activities apply:


  • BESS4 covers systems with more than 20 kWh and up to 200 kWh of usable capacity.
  • BESS5 covers commercial and industrial systems with more than 200 kWh and up to 30 MWh of usable capacity.


Eligible battery installations can receive an indicative discount of 20% to 30%. If you want to add additional solar panels, the indicative discount increases to 30% to 40%.


Quality Energy brings more than 35 years of commercial and industrial electrical experience to these projects. Our team assesses energy use, demand charges, solar production, electrical infrastructure and power quality before recommending a system. 



Book a feasibility study with our team to confirm your BESS4 or BESS5 eligibility and calculate the potential incentive, project savings and financial return for your NSW site.

NSW Commercial Battery Incentive at a Glance

Requirement BESS4 BESS5
Intended applicant Small and medium businesses Commercial and industrial businesses
Usable battery capacity More than 20 kWh and up to 200 kWh More than 200 kWh and up to 30 MWh
Capacity eligible for support Based on the BESS4 calculation Limited to the first 10 MWh
Battery requirements Must appear on the Clean Energy Council approved battery list Must satisfy the required fire testing and control requirements
Installer Solar Accreditation Australia accredited installer Suitably licensed installer
New solar required Optional. New solar capacity must equal at least 25% of the new battery capacity. Optional, with a larger discount available when qualifying solar is added
Residential buildings Excluded Excluded
Data centres Excluded Excluded
Planning and network approvals Required where applicable Required where applicable
Contribution Required Minimum $5,000 No minimum contribution required

How the NSW Business Battery Incentive Works

The incentive operates through the NSW Peak Demand Reduction Scheme. Eligible battery installations create Peak Reduction Certificates (PRCs), based on their capacity to reduce demand on the electricity grid during peak periods.


Accredited Certificate Providers create and sell these certificates. The certificate revenue funds the discount offered to the business. Most businesses will see the discount as a separate line item in their installation quote. 


Large BESS projects may use another financial arrangement due to the number and value of certificates involved. Options can include a staged discount, payment after certificate registration, a fixed certificate purchase agreement, a share of the certificate sale proceeds or a reduction in project finance payments. 


For combined solar and battery projects funded through a power purchase agreement, the certificate value may also be reflected in the contracted electricity price or other project terms.



Installers offering the incentive must work with an Accredited Certificate Provider approved by the Independent Pricing and Regulatory Tribunal. IPART administers the Peak Demand Reduction Scheme and sets the requirements for BESS4 and BESS5 projects.

How Much Is the NSW Commercial Battery Discount?

The NSW Government Batteries for Businesses Incentive provides two indicative ranges:

  • Approximately 30% to 40% off an eligible battery installed with qualifying new or additional solar
  • Approximately 20% to 30% off an eligible battery installed without new solar


The final value depends on:

  • Usable battery capacity
  • Battery inverter output
  • New solar capacity
  • PRC market value
  • Equipment selection
  • Installation design
  • Switchboard or transformer work
  • Planning and network approvals
  • Project administration and compliance costs


PRC values move with the market, so the discount should be calculated for the specific project and confirmed in writing.



Quality Energy can review the site, model the proposed system and prepare an indicative incentive calculation as part of the feasibility process.

Combining Federal Battery Support & NSW Incentives

Eligible NSW businesses can combine the BESS4 incentive with support from the Australian Government’s Cheaper Home Batteries Program.


The programs assess battery capacity differently:

  • Federal eligibility requires nominal battery capacity between 5 kWh and 100 kWh.
  • Federal STCs are calculated on usable capacity, with support limited to the first 50 kWh.
  • BESS4 applies to eligible batteries with more than 20 kWh and up to 200 kWh of usable capacity.
  • The BESS4 calculation uses the lower of the battery’s usable capacity and four times its inverter output.



This creates an overlap for some commercial batteries. An 80 kWh battery can qualify for both programs when its nominal capacity is no more than 100 kWh and all other product, solar, installer and site requirements are met. 

Example: An 80 kWh Commercial Battery

Consider an eligible NSW business installing:

  • An 80 kWh battery (nominal capacity below 100 kWh)
  • A 20 kW battery inverter
  • Has existing solar with a total capacity no greater than 100 kW
  • No previous battery incentive claim at the site



The example uses certificate market prices reported on 31 August 2026. 

Federal Battery STCs

For batteries installed between May and December 2026, the federal STC factor is 6.8. Support reduces across three usable capacity bands:

Useable Capacity Band Calculation Estimated STCs
First 14 kWh 14 x 6.8 95.20
Next 14 kWh 14 x 6.8 x 60% 57.12
Next 22 kWh 22 x 6.8 x 15% 22.44
Total supported capacity 50 kWh 174.76

The installation would generate approximately 175 federal STCs, subject to the final REC Registry calculation. At an illustrative STC value of $39.85, the gross certificate value would be approximately $6,970.



The remaining 30 kWh receives no additional federal battery STCs, as federal support stops at 50 kWh capacity. The full 80 kWh can still contribute to the NSW BESS4 calculation. 

NSW BESS4 Incentive With Existing Solar

BESS4 first determines the capacity recognised by the scheme:


Recognised battery capacity = lower of 80 kWh or 4 × 20 kW


Recognised battery capacity = 80 kWh


Using the current BESS4 formula for a battery added to an established solar system:


Demand shifting component


= (50 × 0.067 × 0.5) + (30 × 0.067 × 0.7)
= 3.082 kW


Peak Reduction Certificates


= 3.082 × 6 peak hours × 15 years × 1.05 network loss factor × 10
= 2,912 PRCs after scheme rounding



At an illustrative PRC value of $3.35, the gross certificate value would be approximately $9,755. This calculation follows the worked BESS4 example in IPART’s September 2026 Method Guide. 

Indicative Combined Support Using Our 80 kWh Example

Incentive Estimated certificates Illustrative gross value
Federal battery STCs Approximately 175 STCs Approximately $6,970
NSW BESS4 2,912 PRCs Approximately $9,755
Combined Approximately $16,700

By combining the BESS4 incentive and Federal Battery Rebate, you could receive around $16,700 discounts when installing an 80kWh battery. These figures represent gross certificate values. Certificate prices, registration costs, compliance work and the Accredited Certificate Provider’s commercial terms affect the final amount.


BESS 4 Factsheet:


https://www.energysustainabilityschemes.nsw.gov.au/pdrs/documents/fact-sheet/sasc-bess4-fact-sheet

Installing New Solar With the Battery

The NSW incentive increases when eligible new or additional solar is installed within 90 days before or after the battery. Using our 80 kWh battery example, the new solar capacity must be at least 20 kW to meet the requirement of new solar installations being at least 25% of the battery’s capacity.


Using the same battery, inverter, location and certificate price assumptions, a qualifying solar and battery installation could generate approximately:


  • 4,347 NSW PRCs
  • Approximately $14,560 in gross NSW certificate value
  • Approximately $6,970 in federal battery STC value
  • Approximately $21,500 in combined gross certificate value


The new solar system could also generate separate solar STCs. That value depends on the solar capacity, installation date and location, so it has been excluded from this example.



Quality Energy can assess your battery capacity, inverter output, existing solar, proposed solar expansion and network location before preparing an incentive assessed quote. Contact Quality Energy for a commercial battery or combined solar and battery proposal showing the project cost, available discounts and estimated energy savings.

BESS5 Incentives for Commercial and Industrial Batteries

BESS5 covers batteries with more than 200 kWh and up to 30 MWh of usable capacity. The incentive calculation applies to the first 10 MWh. 

This category is designed for sites such as:


  • Manufacturing plants
  • Cold storage facilities
  • Food and beverage processors
  • Warehouses and distribution centres
  • Shopping centres
  • Large agricultural operations
  • Hospitals and healthcare facilities
  • Commercial property portfolios
  • Sites installing high capacity electric vehicle charging



Larger projects require detailed electrical and financial modelling. The battery must integrate with the site’s switchboards, transformers, protection systems, solar generation and network connection.

Higher Battery Discounts for Projects With New Solar

A business can receive the NSW incentive for a battery installed without new solar. The higher discount applies when enough qualifying new or additional solar is installed with the battery.


The solar must be installed within 90 days before or after the battery.


New solar capacity must equal at least 25% of the new battery capacity. This is a minimum solar to battery ratio of one to four.



Examples include:

Battery Capacity Minimum Qualifying New Solar
100 kWh 25 kW
200 kWh 50 kW
500 kWh 125 kW
1 MWh 250 kW
4 MWh 1 MW

The final calculation must use the capacity definitions in the PDRS Rule.


A business with existing solar must install additional qualifying solar within the 90 day period to receive the higher discount. Existing solar still affects system design because it contributes to the energy available for storage.



Quality Energy can model the existing and proposed generation together, then determine whether extra solar improves the battery incentive and financial return.

Commercial Solar Support Expanding From 1 October 2026

The Australian Government plans to expand the Small Scale Renewable Energy Scheme to eligible solar installations with more than 100 kW and no more than 1 MW of total onsite capacity.


The change is expected to apply to systems installed from 1 October 2026.


Eligible mid scale systems will now use a five year deeming period through to the end of the scheme in 2030. This allows qualifying commercial solar projects to create Small Scale Technology Certificates for upfront discounts on the cost of
installing a commercial solar system. 

Combining the NSW Battery and Federal Solar Incentives

The strongest funding opportunity applies to NSW businesses installing a commercial battery with qualifying new solar.


A project may receive:

  • A BESS4 or BESS5 discount on the battery
  • The higher NSW battery calculation for adding enough new solar
  • Federal STC support for qualifying solar above 100 kW and up to 1 MW


Consider a proposed 1 MWh BESS5 battery with 250 kW of new solar.


The 250 kW solar system would generally meet the NSW requirement for new solar capacity equal to at least 25% of the battery capacity. Subject to the final federal regulations, the solar installation would also fall within the expanded SRES capacity range.


The Australian Government estimates federal solar support of approximately $68,000 for a 250 kW system. The battery would receive a separate BESS5 discount calculated under the NSW scheme.


Quality Energy can assess both incentives within one project model, giving planning teams a clear view of capital cost, certificate assumptions, annual savings and expected payback. Complete our contact form to arrange a no obligation feasibility study.

Building the Commercial Case for BESS

A lower purchase price strengthens the investment case, but the battery still needs a defined operating purpose. Commercial batteries commonly create value through:


Peak Demand Reduction:
The battery discharges when site demand approaches a set limit. This reduces the highest kW reading used to calculate some demand charges. The inverter must supply enough power to cover the demand spike, while the battery must hold enough energy to sustain that output for the required period.


Solar Energy Storage:
Excess solar charges the battery during the day. The business then uses that energy after solar production falls. This works well for facilities with afternoon, evening or overnight loads.


Electricity Tariff Management:
The battery charges when electricity costs less and discharges during expensive tariff periods. The available savings depend on the difference between charging and discharging prices, battery efficiency and degradation.


Operational Continuity:
A battery designed for backup can support selected loads during a power outage. The design must define which equipment will remain operational, the power required and the expected backup duration.


Demand Response:
Eligible batteries can respond to external instructions from an aggregator, supporting the grid during periods of high demand. BESS5 systems must be internet connectable and controllable by a Demand Response Aggregator.

Request Your Commercial Battery and Solar Quote

A Quality Energy feasibility study gives your planning team the figures needed to assess a commercial battery investment. We analyse your interval data, electricity tariffs, demand profile, existing solar and site requirements to determine the recommended battery capacity, expected savings, available incentives, project cost and estimated payback period.



Complete our form below to arrange a feasibility study for your commercial battery or combined solar and battery project, or give our friendly team a call on 1800 736 374.


Related news

A row of wind turbines along a coast
September 24, 2025
According to Clean Energy Council Australia, electricity generation is Australia’s largest source of greenhouse gas emissions, and taking action now to accelerate the transition to a clean energy future will lessen the volatility in our climate. Beyond the serious threats that greenhouse gas emissions pose to our plane
quality energy active harmonic filters for ieee 519 compliance
By Michelle Kemp • February 4, 2025
Learn about standard IEEE-519 and why compliance is needed in 2026. Need help meeting requirements? Talk to Quality Energy today.
Inside a Static Var Generator
By Michelle Kemp • November 24, 2024
What do Static Var Generators do? This article explains how clever they are.
More Posts