Moana, South Australia
The Problem
The Solution
Quality Energy installed a 120kW EV charger and a distribution board to manage the additional load efficiently. Electrical work on the main switchboard was done outside of business hours to ensure the power outage doesn't affect business. The hydro excavation was done to reduce damage to existing services.
Benefits and Outcomes
Key equipment
- ABB 120kW 3-phase EV charger
- Installation of Chargefox switchboard
- Electrical works
- Civil works