The problem


Newscorp’s Brisbane Print Centre had their tariff changed which meant that Energex started penalising them for having a poor power factor.

The solution

After analysing Newcorp's electricity usage and charges, our engineers determined they required over 3,500 kVAr of capacitor banks over six substations to achieve the ideal Power Factor that could maximise their electricity savings.

Benefits and Outcomes

Key equipment

Quality Energy designed and manufactured Low Voltage Power Factor Correction Systems

System size

3,500 kVAr Power Factor Correction

Project warranty

3 Years